Client:                                  Moreton Bay Regional Council

Project:                                Sports Field Lighting Upgrades – Package 1

Duration:                            May 2021 – Sep 2021

Project Value:                   $745,000.00

Project Details:                 This project covers three sport facilities in the MBRC region. The scope of works includes the installation of new sport field lighting including associated electrical works, trenching & civil, structural, control systems & commissioning. The project objective is to ensure that sport fields are serviced by compliant lighting that can be maintained to a safe and serviceable condition. The three sites are all situated on decommissioned land fills and as such additional investigation works were completed prior to works commencing on site and all necessary controls put in place.  New lighting was installed on Field 3 at Bob Brock park to meet 50/100 lux requirements for soccer training and games.  James Drysdale Reserve also involved new lighting to field 3 for soccer training and games with capability to switch between 50 and 100lux. Talobilla Park is a softball facility and new lighting was installed to field 5 to meet the requirements of AS2560.2.6 Lighting for baseball and softball Local Club Competition – 250 Lux.

Back
MBRC Lighting Upgrade
Detail Download
MBRC Lighting Upgrade
Detail Download
MBRC Lighting Upgrade
Detail Download
MBRC Lighting Upgrade
Detail Download
MBRC Lighting Upgrade
Detail Download
 
 
Powered by Phoca Gallery