Client:                                  Roman Catholic Archdiocese of Brisbane

Project:                                Assisi College Stage 4, Coomera

Duration:                            October 2009 to June 2010

Project Value:                   $1,450,000

Project Details:                As Principle Contractor on this site our contract includes Bulk Earthworks on a hillside, tree clearing under strict environmental and wildlife controls, topsoil stripping, reinstating of original lake design through de-silting and reshaping, construction of Regulation Type 4 sports field, retained buildings, access roads and car parks with minimal environmental intrusion on surrounding bush land.

New works also included a turf table drain overflow with water services both potable and recycled, electrical, sewage and storm water pipelines, footpaths, culvert drains, ball sportscourts and recreational play areas.

Special requirements are being undertaken during construction stages due to the seasonal breeding of local fauna in and around the project objectives.

During all stages Gold Coast Water and Assisi College water contamination experiments being conducted.

Back
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
Assisi College Stage 4, Coomera
Detail Download
 
 
Powered by Phoca Gallery